ELECTRICAL POWER SYSTEM
Abstract
A power system has a first control apparatus configured to generating a
first command signal and a second command signal, to control the first
converter on the basis of the first command signal, and to transmit the
second command signal to a second control apparatus and the second
control apparatus configured to control the second converter on the basis
of the received second command signal. When it is requested that a state
of each of the first and second converters is changed from a first state
to a second state, the first control apparatus generates the first and
second command signals so that the state of the second converter is
changed to a third state in which both of the upper arm and the lower arm
keep being in the OFF state, then the state of the first converter is
changed from the first state to the second state, and then the state of
the second converter is changed from the third state to the second state.
| Inventors: |
HIRANO; Kosuke; (Toyota-shi, JP)
; OKAMURA; Masaki; (Toyota-shi, JP)
; YAMAKAWA; Toshifumi; (Okazaki-shi, JP)
; FUJITA; Jun; (Tokai-shi, JP)
; KAMIKAWA; Ryo; (Toyota-shi, JP)
|
| Applicant: | | Name | City | State | Country | Type | TOYOTA JIDOSHA KABUSHIKI KAISHA | Toyota-shi | |
JP | | |
| Assignee: |
TOYOTA JIDOSHA KABUSHIKI KAISHA
Toyota-shi
JP
|
| Family ID:
|
62489654
|
| Appl. No.:
|
15/837474
|
| Filed:
|
December 11, 2017 |
| Current U.S. Class: |
1/1 |
| Current CPC Class: |
B60L 50/51 20190201; H02M 3/1584 20130101; H02M 1/0054 20210501; Y02B 70/10 20130101; H02M 3/1582 20130101; H02M 3/158 20130101; H02M 7/42 20130101; H02M 1/00 20130101 |
| International Class: |
H02M 1/00 20060101 H02M001/00; H02M 3/158 20060101 H02M003/158; H02M 7/42 20060101 H02M007/42 |
Foreign Application Data
| Date | Code | Application Number |
| Dec 13, 2016 | JP | 2016-241127 |
Claims
1. An electrical power system comprising: a first converter that has an
upper arm and a lower arm and that is configured to boost or step down
electrical voltage outputted from one of an electrical power source and a
load and then to output the boosted or stepped-down electrical voltage to
the other one of the electrical power source and the load; a second
converter that has an upper arm and a lower arm and that is configured to
boost or step down electrical voltage outputted from one of the
electrical power source and the load and then to output the boosted or
stepped-down electrical voltage to the other one of the electrical power
source and the load; a first control apparatus that is configured to
generate a first command signal and a second command signal, to control
the upper arm and the lower arm of the first converter on the basis of
the first command signal, and to transmit the second command signal to a
second control apparatus through a communication line; and the second
control apparatus that is configured to receive the second command signal
transmitted from the first control apparatus, and to control the upper
arm and the lower arm of the second converter on the basis of the
received second command signal, wherein when it is requested that a state
of each of the first and second converters in a first state in which the
upper arm and the lower arm are switched alternately in a complementary
manner is changed to a second state in which the upper arm keeps being in
an ON state and the lower arm keeps being in an OFF state or it is
requested that the state of each of the first and second converters in
the second state is changed to the first state, the first control
apparatus is configured to generate the first and second command signals
so that (i) the state of the second converter is changed from the first
or second state to a third state in which both of the upper arm and the
lower arm keep being in the OFF state, then (ii) the state of the first
converter is changed from the first state to the second state or from the
second state to the first state after the state of the second converter
is changed to the third state, and then (iii) the state of the second
converter is changed from the third state to the second or first state
after the state of the first converter is changed from the first state to
the second state or from the second state to the first state.
2. The electrical power system according to claim 1, wherein the first
control apparatus is configured to generate the first command signal that
requests the first converter to keep being in the first or second state
until a first predetermined time elapses after generating the second
command signal that requests a start of changing the state of the second
converter to the third state, the first control apparatus is configured
to generate the first command signal that requests a change of state of
the first converter from the first state to the second state or from the
second state to the first state after the first predetermined time
elapses after generating the second command signal that requests the
start of changing the state of the second converter to the third state,
the first predetermined time is equal to or longer than a delay time that
is required for the second control apparatus to start to control the
second converter on the basis of the generated second command signal
after the first control apparatus generates the second command signal.
3. The electrical power system according to claim 2, wherein the first
control apparatus is configured to generate the second command signal
that requests the change of the state of the second converter from the
third state to the second or first state after a second predetermined
time elapses after generating the second command signal that requests the
start of changing the state of the second converter to the third state,
the second predetermined time is longer than a difference between the
first predetermined time and the delay time.
Description
TECHNICAL FIELD
[0001] The present invention relates to a technical field of an electrical
power system that has: a plurality of converters; and a plurality of
control apparatuses that are configured to control the plurality of
converters, respectively, for example.
BACKGROUND ART
[0002] Each of a Patent Literature 1 and a Patent Literature 2 discloses
an electrical power system that has an electrical power source; a load; a
plurality of converters that are electrically connected in parallel
between the electrical power source and the load; and a plurality of
control apparatuses (these correspond to controlling units in the Patent
Literature 1 or driving circuits in the Patent Literature 2) that are
configured to control the plurality of converters, respectively. Each of
the plurality of converters includes a plurality of switching elements
each of which is referred to as an upper arm or a lower arm. Each of the
plurality of converters is configured to switch the upper arm and the
lower arm in a complementary manner (namely, to repeatedly turn on and
then turn off the upper arm and the lower arm alternately) to boost
electrical voltage outputted from the electrical power source and then
output the boosted electrical voltage to the load.
CITATION LIST
Patent Literature
[Patent Literature 1] Japanese Unexamined Patent Application Publication
No. 2011-114918
[Patent Literature 2] Japanese Unexamined Patent Application Publication
No. 2012-210138
SUMMARY OF INVENTION
Technical Problem
[0003] The switching of the upper arm and the lower arm causes switching
loss. In order to reduce the switching loss, the state of the converter
may be changed to an upper arm ON state in which the upper arm keeps
being in an ON state and the lower arm keeps being in an OFF state. In
this case, the electrical power source is electrically connected to the
load through the upper arm that keeps being in the ON state. Moreover,
the switching loss is reduced, because each of the upper arm and the
lower arm is not switched. However, when the converter in the upper arm
ON state is not capable of boosting the electrical voltage outputted from
the electrical power source. Thus, the state of the converter is changed
to a boosting state in which the upper arm and the lower arm are switched
in a complementary manner when it is required for the converter to boost
the electrical voltage outputted from the electrical power source, and
the state of the converter is changed to the upper arm ON state when it
is not required for the converter to boost the electrical voltage
outputted from the electrical power source.
[0004] By the way, in the Patent Literatures 1 and 2, the plurality of
control apparatuses are configured to generate a plurality of command
signals, respectively, wherein the plurality of command signals are used
to control the plurality of converters, respectively. Namely, a first
control apparatus of the plurality of control apparatuses is configured
to generate a first command signal for controlling a first converter of
the plurality of converters, and a second control apparatus of the
plurality of control apparatuses is configured to generate a second
command signal for controlling a second converter of the plurality of
converters. On the other hand, inventors of the present invention
develops a technique in which the first control apparatus is configured
to generate both of the first and second command signals. In this case,
the first control apparatus is configured to control the first converter
on the basis of the generated first command signal and to transmit the
generated second command signal to the second control apparatus through a
communication line. The second control apparatus is configured to receive
the second command signal and then to control the second converter on the
basis of the received second command signal.
[0005] In this case, a time period (a time interval) between a timing at
which the first control apparatus generates the second command signal and
a timing at which the second control apparatus starts to control the
second converter on the basis of the generated second command signal is
longer than a time period between a timing at which the first control
apparatus generates the first command signal and a timing at which the
first control apparatus starts to control the first converter on the
basis of the generated first command signal. This is because a delay
occurs when the second control apparatus controls the second converter on
the basis of the second command signal, compared to the case where the
first control apparatus controls the first converter on the basis of the
first command signal. The delay includes a first delay corresponding to a
time period that is required for the first control apparatus to transmit
the second command signal generated by the first control apparatus to the
second control apparatus and a second delay corresponding to a time
period required for the second control apparatus to receive the
transmitted second command signal and then to actually start to control
the second converter on the basis of the received second command signal.
If this delay occurs, there is a possibility that undesired large
electrical current flows from the first converter to the second converter
or from the second converter to the first converter when the state of
each of the first and second converters is changed from the upper arm ON
state to the boosting state or from the boosting state to the upper arm
ON state, which is a technical problem.
[0006] Specifically, an example in which the state of each of the first
and second converters is changed from the upper arm ON state to the
boosting state will be described below. In this case, the first control
apparatus generates the first and second command signals for
simultaneously changing the state of each of the first and second
converters from the upper arm ON state to the boosting state. However,
due to the above described delay, a timing at which the state of the
second converter is changed from the upper arm ON state to the boosting
state on the basis of the second command signal is delayed with respect
to a timing at which the state of the first converter is changed from the
upper arm ON state to the boosting state on the basis of the first
command signal. As a result, a time period when the second converter is
in the upper arm ON state although the first converter is in the boosting
state exists. In this time period, the electrical voltage that is
outputted to the load is not boosted, because the second converter tries
to output the electrical voltage outputted from the electrical power
source to the load without boosting the electrical voltage while the
first converter tries to output the electrical voltage outputted from the
electrical power source to the load after boosting the electrical
voltage. Thus, if the first converter keeps to perform an operation for
boosting the electrical voltage outputted to the load, the first
converter tries to boost the electrical voltage outputted to the load by
allowing the relatively large electrical current to flow. However, the
relatively large electrical current flows from the first converter to the
second converter. As a result, the relatively large electrical current
flows through the first and second converters. Thus, there is a
possibility that characteristics of each of the first and second
converters relating to resistance to heat deteriorates.
[0007] Note that if the load is configured to generate the electrical
power (for example, the load is the electrical power generator), the
plurality of converters are allowed to switch the upper arm and the lower
arm in a complementary manner to step down the electrical voltage
generated by the load and then output the stepped-down electrical voltage
to the electrical power source (namely, charge the electrical power
source). Namely, the converter in the boosting state is configured not
only to boost the electrical voltage outputted from the electrical power
source and then output the boosted electrical power to the load but also
to step down the electrical voltage outputted from the load and then
output the stepped-down electrical voltage to the electrical power
source. Thus, the above described technical problem occurs not only when
the converter boosts the electrical voltage outputted from the electrical
power source and then output the boosted electrical power to the load but
also when the converter steps down the electrical voltage outputted from
the load and then output the stepped-down electrical voltage to the
electrical power source.
[0008] The above described technical problem is one example of the
technical problem to be solved by the present invention. It is therefore
an object of the present invention to provide, for example, an electrical
power system that is configured to appropriately change the state of each
of the plurality of converters from a first state in which the upper arm
and the lower arm are switched in a complementary manner to a second
state in which the upper arm keeps being in the ON state and the lower
arm keeps being in the OFF state or from the second state to the first
state, while suppressing deterioration of the characteristics of the
plurality of converters relating to the resistance to the heat.
Solution to Problem
[0009] <1>
[0010] One aspect of an electrical power system is an electrical power
system that has: a first converter that has an upper arm and a lower arm
and that is configured to boost or step down electrical voltage outputted
from one of an electrical power source and a load and then to output the
boosted or stepped-down electrical voltage to the other one of the
electrical power source and the load; a second converter that has an
upper arm and a lower arm and that is configured to boost or step down
electrical voltage outputted from one of the electrical power source and
the load and then to output the boosted or stepped-down electrical
voltage to the other one of the electrical power source and the load; a
first control apparatus that is configured to generate a first command
signal and a second command signal, to control the upper arm and the
lower arm of the first converter on the basis of the first command
signal, and to transmit the second command signal to a second control
apparatus through a communication line; and the second control apparatus
that is configured to receive the second command signal transmitted from
the first control apparatus, and to control the upper arm and the lower
arm of the second converter on the basis of the received second command
signal, wherein when it is requested that a state of each of the first
and second converters in a first state in which the upper arm and the
lower arm are switched alternately in a complementary manner is changed
to a second state in which the upper arm keeps being in an ON state and
the lower arm keeps being in an OFF state or it is requested that the
state of each of the first and second converters in the second state is
changed to the first state, the first control apparatus is configured to
generate the first and second command signals so that (i) the state of
the second converter is changed from the first or second state to a third
state in which both of the upper arm and the lower arm keep being in the
OFF state, then (ii) the state of the first converter is changed from the
first state to the second state or from the second state to the first
state after the state of the second converter is changed to the third
state, and then (iii) the state of the second converter is changed from
the third state to the second or first state after the state of the first
converter is changed from the first state to the second state or from the
second state to the first state.
[0011] According to one aspect of the electrical power system, one of the
first and second converters is not in the first state when the other one
of the first and second converters is in the second state. Thus,
relatively large electrical current does not flow from one of the first
and second converters to the other one of the first and second converters
when the state of each of the first and second converters is changed.
Therefore, one aspect of the electrical power system is capable of
appropriately changing the state of each of the plurality of converters
from the first state to the second state or from the second state to the
first state while suppressing deterioration of the characteristics of the
plurality of converters relating to the resistance to the heat.
[0012] <2>
[0013] In another aspect of the above described one aspect of the
electrical power system, the first control apparatus is configured to
generate the first command signal that requests the first converter to
keep being in the first or second state until a first predetermined time
elapses after generating the second command signal that requests a start
of changing the state of the second converter to the third state, the
first control apparatus is configured to generate the first command
signal that requests a change of state of the first converter from the
first state to the second state or from the second state to the first
state after the first predetermined time elapses after generating the
second command signal that requests the start of changing the state of
the second converter to the third state, the first predetermined time is
equal to or longer than a delay time that is required for the second
control apparatus to start to control the second converter on the basis
of the generated second command signal after the first control apparatus
generates the second command signal.
[0014] According to this aspect, the first control apparatus is capable of
appropriately generating the first command signal that allows the state
of the first converter to be changed from the first state to the second
state or from the second state to the first state after the state of the
second converter is changed from the first or second state to the third
state.
[0015] <3>
[0016] In another aspect of the above described one aspect of the
electrical power system, the first control apparatus is configured to
generate the second command signal that requests the change of the state
of the second converter from the third state to the second or first state
after a second predetermined time elapses after generating the second
command signal that requests the start of changing the state of the
second converter to the third state, the second predetermined time is
longer than a difference between the first predetermined time and the
delay time.
[0017] According to this aspect, the first control apparatus is capable of
appropriately generating the second command signal that allows the state
of the second converter to be changed from the third state to the first
or second state after the state of the first converter is changed from
the first state to the second state or from the second state to the first
state.
[0018] The operation and other advantages in the present invention will
become more apparent from the embodiments explained below. The object and
advantages of the present invention will be realized and attained by
means of the elements and combinations particularly pointed out in the
claims. It is to be understood that both the foregoing general
description and the following detailed description are exemplary and
explanatory and are not restrictive of the embodiment, as claimed.
BRIEF DESCRIPTION OF DRAWINGS
[0019] FIG. 1 is a block diagram that illustrates one example of an entire
structure of a vehicle of the present embodiment.
[0020] FIG. 2 is a flowchart that illustrates a flow of an entire
operation for controlling first and second converters.
[0021] FIG. 3 is a flowchart that illustrates a flow of an operation for
changing a state of each of the first and second converter from a
boosting state to an upper arm ON state.
[0022] FIG. 4 is a flowchart that illustrates a flow of an operation for
changing the state of each of the first and second converter from the
upper arm ON state to the boosting state.
[0023] FIG. 5 is a timing chart that illustrates temporal transition of
the state of an electrical power system in a comparison example, when the
electrical power system in the comparison example changes the state of
each of the first and second converter from the boosting state to the
upper arm ON state.
[0024] FIG. 6 is a timing chart that illustrates temporal transition of
the state of the electrical power system in the comparison example, when
the electrical power system in the comparison example changes the state
of each of the first and second converter from the upper arm ON state to
the boosting state.
[0025] FIG. 7 is a timing chart that illustrates temporal transition of
the state of an electrical power system in a present embodiment, when the
electrical power system in the present embodiment changes the state of
each of the first and second converter from the boosting state to the
upper arm ON state.
[0026] FIG. 8 is a timing chart that illustrates temporal transition of
the state of the electrical power system in present embodiment, when the
electrical power system in present embodiment changes the state of each
of the first and second converter from the upper arm ON state to the
boosting state.
[0027] FIG. 9 is a timing chart that illustrates temporal transition of
the state of the electrical power system in present embodiment, when the
electrical power system in present embodiment changes the state of each
of the first and second converter from the upper arm ON state to the
boosting state.
DESCRIPTION OF EMBODIMENTS
[0028] Hereinafter, an embodiment of the electrical power system of the
present invention will be explained. Note that, in the following
description, a vehicle 1 to which the embodiment of the electrical power
system of the present invention is adapted will be explained. However,
the electrical power system of the present invention and its embodiment
may be adapted to any apparatus that is different from the vehicle 1.
[0029] (1) Structure of Vehicle 1
[0030] With reference to a block diagram illustrated in FIG. 1, the
structure of the vehicle 1 in the present embodiment will be explained.
As illustrated in FIG. 1, the vehicle 1 has: a motor generator 10 that is
one example of the "load" and the electrical power system 30. Note that
FIG. 1 illustrates, as one example of the vehicle, the vehicle 1 that has
one motor generator 10. However, the vehicle 1 may have two or more motor
generators 10. Furthermore, the vehicle 1 may have an engine in addition
to the motor generator 10.
[0031] The motor generator 10 is configured to operate by using an
electrical power that is outputted from the electrical power system 30,
when the vehicle 1 is in a power running state. Thus, the motor generator
10 is configured to serve as a motor for supplying a driving power that
is used by the vehicle 1 to move. Moreover, the motor generator 10 is
configured to serve as a generator for charging an electrical power
source 31 of the electrical power system 30, when the vehicle 1 is in a
regeneration state.
[0032] The electrical power system 30 is configured to output to the motor
generator 10 the electrical power that is used by the motor generator 10
to serve as the motor, when the vehicle 1 is in the power running state.
Furthermore, the electrical power that is generated by the motor
generator 10 serving as the generator is inputted from the motor
generator 10 to the electrical power system 30, when the vehicle 1 is in
the regeneration state.
[0033] The electrical power system 30 has: the electrical power source 31,
a first converter 33, a second converter 34, a smoothing condenser 35, an
inverter 36, a first control apparatus 37 and a second control apparatus
38.
[0034] The electrical power source 31 is an apparatus that is configured
to output the electrical power (namely, discharging). The electrical
power source 31 is an apparatus to which the electrical power can be
inputted (namely, that can be charged). The electrical power source 31
may include a battery that includes at least one of a lead battery, a
lithium-ion battery, a nickel-hydrogen battery, a fuel battery and the
like. The electrical power source 31 may include a capacitor that
includes at least one of a lithium-ion capacitor, an electrical double
layer capacitor and the like.
[0035] The first converter 33 is configured to boost electrical voltage of
the DC (Direct Current) electrical power outputted from the electrical
power source 31 and to output the boosted electrical power to the motor
generator 10 through the inverter 36, under the control of the first
control apparatus 37. Moreover, the first converter 33 is configured to
step down electrical voltage of the DC electrical power outputted from
the motor generator 10 through the inverter 36 and to output the
stepped-down electrical power to the electrical power source 31, under
the control of the first control apparatus 37. The second converter 34 is
configured to boost electrical voltage of the DC electrical power
outputted from the electrical power source 31 and to output the boosted
electrical power to the motor generator 10 through the inverter 36, under
the control of the second control apparatus 38. Moreover, the second
converter 34 is configured to step down electrical voltage of the DC
electrical power outputted from the motor generator 10 through the
inverter 36 and output the stepped-down electrical power to the
electrical power source 31, under the control of the second control
apparatus 38. The first converter 33 and the second converter 34 are
electrically connected in parallel between the electrical power source 31
and the motor generator 10.
[0036] In order to boost and step down (namely, convert) the electrical
voltage, the first converter 33 has: an upper arm element 331 that is one
example of the "upper arm"; a lower arm element 332 that is one example
of the "lower arm"; a reactor 333; a diode 334; and a diode 335. Each of
the upper arm element 331 and the lower arm element 332 is a switching
element such as a transistor. Each of the upper arm element 331 and the
lower arm element 332 is configured to be switched on the basis of
command signal C1* that is outputted from the first control apparatus 37.
Namely, state of each of the upper arm element 331 and the lower arm
element 332 is changed from an ON state to an OFF state or from the OFF
state to the ON state on the basis of the command signal C1*.
Alternatively, each of the upper arm element 331 and the lower arm
element 332 keeps being in the ON state or the OFF state on the basis of
the command signal C1*. The upper arm element 331 and the lower arm
element 332 are electrically connected in series between a power source
line PL and a ground line GL. The reactor 333 is electrically connected
between a cathode of the electrical power source 31 and an intermediate
node N1, wherein the intermediate node N1 is between the upper arm
element 331 and the lower arm element 332. The diodes 334 and 335 are
electrically connected in parallel to the upper arm element 331 and the
lower arm element 332, respectively, in an inverse-parallel manner.
[0037] In order to convert the electrical voltage, the second converter 34
has: an upper arm element 341 that is one example of the "upper arm"; a
lower arm element 342 that is one example of the "lower arm"; a reactor
343; a diode 344; and a diode 345. Note that the structure of the second
converter 34 is same as the structure of the first converter 33, and
thus, the detailed description of the second converter 34 is omitted.
[0038] The smoothing condenser 35 is configured to smooth a variation of
the electrical voltage between the power source line PL and the ground
line GL. In the following description, the electrical voltage between the
power source line PL and the ground line GL is referred to as a "system
voltage VH". Note that each of the power source line PL and the ground
line GL connects the inverter 36 and each of the first converter 33 and
the second converter 34.
[0039] The inverter 36 is configured to convert the DC electrical power
that is outputted from the first converter 33 and the second converter 34
to an AC (Alternate Current) electrical power, when the vehicle 1 is in
the power-running state. The inverter 36 is configured to convert the AC
electrical power that is generated by the motor generator 10 to the DC
electrical power, when the vehicle 1 is in the regeneration state.
[0040] The first control apparatus 37 is configured to generate the
command signal C1* for controlling the first converter 33 and command
signal C2* for controlling the second converter 34. The first control
apparatus 37 is configured to control the first converter 33 (especially,
the upper arm element 331 and the lower arm element 332) on the basis of
the command signal C1* that is generated by the first control apparatus
37 itself. The first control apparatus 37 is configured to transmit the
command signal C2* that is generated by the first control apparatus 37
itself to the second control apparatus 38 through a wired or wireless
communication line 39 that connects the first control apparatus 37 and
the second control apparatus 38.
[0041] The second control apparatus 38 is configured to receive the
command signal C2* transmitted from the first control apparatus 37. The
second control apparatus 38 is configured to control the second converter
34 (especially, the upper arm element 341 and the lower arm element 342)
on the basis of the received command signal C2*.
[0042] In the present embodiment, the first converter 37 is configured to
control the first converter 33 so that the state of the first converter
33 is changed between a boosting state that is one example of the "first
state" and an upper arm ON state that is one example of the "second
state". The second converter 38 is also configured to control the second
converter 34 so that the state of the second converter 34 is changed
between the boosting state and the upper arm ON state.
[0043] The boosting state includes a state in which the upper arm element
331 and the lower arm element 332 are alternately switched (namely,
turned on and then turned off repeatedly) in a complementary manner and a
state in which the upper arm element 341 and the lower arm element 342
are alternately switched in a complementary manner. Each of the first
converter 33 and the second converter 34 in the boosting state is capable
of boost the electrical voltage of the electrical power that is outputted
from the electrical power source 31 and is capable of stepping down the
electrical voltage of the electrical power that is outputted from the
motor generator 10.
[0044] The upper arm ON state includes a state in which the upper arm
element 331 keeps being in the ON state and the lower arm element 332
keeps being in the OFF state and a state in which the upper arm element
341 keeps being in the ON state and the lower arm element 342 keeps being
in the OFF state. Each of the upper arm element 331 and the lower arm
element 332 is not switched in the first converter 33 in the upper arm ON
state, and thus, the switching loss is reduced. On the other hand,
although the first converter 33 in the upper arm ON state is not capable
of boosting or stepping down the electrical voltage, the electrical power
source 31 is electrically connected to the motor generator 10 through the
upper arm element 331. Same is true in the second converter 34 in the
upper arm ON state.
[0045] (2) Flow of Operation for Controlling First Converter 33 and Second
Converter 34
[0046] In the present embodiment, the first converter 33 and the second
converter 34 are usually controlled so that the state of the first
converter 33 is same as the state of the second converter 34. Namely, the
first converter 33 and the second converter 34 are usually controlled so
that the second converter 34 is in the boosting state when the first
converter 33 is in the boosting state and the second converter 34 is in
the upper arm ON state when the first converter 33 is in the upper arm ON
state. However, when state of each of the first converter 33 and the
second converter 34 is changed from the boosting state to the upper arm
ON state or from the upper arm ON state to the boosting state, the first
converter 33 and the second converter 34 are usually controlled so that
the state of the first converter 33 is allowed to be temporally different
from the state of the second converter 34, as an exceptional case. In the
following description, with reference to FIG. 2 to FIG. 4, an operation
for controlling the first converter 33 and the second converter 34 will
be described in detail.
[0047] (2-1) Entire Flow of Operation for Controlling First Converter 33
and Second Converter 34
[0048] Firstly, with reference to a flowchart illustrated in FIG. 2, an
entire flow of the operation for controlling the first converter 33 and
the second converter 34 will be described.
[0049] As illustrated in FIG. 2, the first control apparatus 37 calculates
a required value of the system voltage VH (a step S101). For example, the
first control apparatus 37 calculates a required torque of the motor
generator 10 on the basis of an operational amount of an accelerator
pedal by a user, an operational amount of a brake pedal by the user, a
speed of the vehicle 1 and the like, and then calculates, as the required
value, a value of the system voltage VH that is required for the motor
generator 10 to output the calculated required torque. Note that the
required torque is a positive torque (namely, a torque that accelerates
the vehicle 1) when the vehicle 1 is in the power running state and the
required torque is a negative torque (namely, a torque that decelerates
the vehicle 1) when the vehicle 1 is in the regeneration state,
typically.
[0050] Then, the first control apparatus 37 determines whether or not both
of the first converter 33 and the second converter 34 are in the boosting
state (a step S102).
[0051] As a result of the determination at the step S102, if it is
determined that both of the first converter 33 and the second converter
34 are in the boosting state (the step S102: Yes), the first control
apparatus 37 determines whether or not it is necessary to change the
state of each of the first converter 33 and the second converter 34 from
the boosting state to the upper arm ON state, on the basis of the
required value of the system voltage VH calculated at the step S101 (a
step S103). Specifically, if the required value of the system voltage VH
is higher than the voltage outputted from the electrical power source 31
(hereinafter, this voltage is referred to as a "source voltage VL"), the
first control apparatus 37 determines that it is not necessary to change
the state of each of the first converter 33 and the second converter 34
from the boosting state to the upper arm ON state. On the other hand, if
the required value of the system voltage VH is equal to the source
voltage VL, the first control apparatus 37 determines that it is
necessary to change the state of each of the first converter 33 and the
second converter 34 from the boosting state to the upper arm ON state.
[0052] As a result of the determination at the step S103, if it is
determined that it is not necessary to change the state of each of the
first converter 33 and the second converter 34 from the boosting state to
the upper arm ON state (the step S103: No), the first control apparatus
37 generates the command signal C1* for allowing the first converter 33
to be in the boosting state (namely, for keeping the first converter 33
to be in the boosting state) (a step S105). Moreover, the first control
apparatus 37 generates the command signal C2* for allowing the second
converter 34 to be in the boosting state (namely, for keeping the second
converter 34 to be in the boosting state) (the step S105).
[0053] Then, the first control apparatus 37 controls the first converter
33 on the basis of the command signal C1* generated at the step S105 (a
step S107). Moreover, the first control apparatus 37 transmits, to the
second control apparatus 38, the command signal C2* generated at the step
S105 (the step S107). The second control apparatus 38 receives the
command signal C2* transmitted from the first control apparatus 37 and
controls the second converter 34 on the basis of the received command
signal C2* (a step S201). As a result, both of the first converter 33 and
the second converter 34 keep being in the boosting state so that the
system voltage VH agree with a target value VH* of the system voltage VH
(hereinafter, this target value VH* is referred to as a "target voltage
VH*"). Note that the target voltage VH* is set by the first control
apparatus 37 so that the target voltage VH* agrees with the required
value of the system voltage VH.
[0054] On the other hand, as a result of the determination at the step
S103, if it is determined that it is necessary to change the state of
each of the first converter 33 and the second converter 34 from the
boosting state to the upper arm ON state (the step S103: Yes), the first
control apparatus 37 and the second control apparatus 38 perform a
below-described operation illustrated in FIG. 3 to change the state of
each of the first converter 33 and the second converter 34 from the
boosting state to the upper arm ON state.
[0055] On the other hand, as a result of the determination at the step
S102, if it is determined that both of the first converter 33 and the
second converter 34 are not in the boosting state (the step S102: No),
both of the first converter 33 and the second converter 34 are supposed
to be in the upper arm ON state. In this case, the first control
apparatus 37 determines whether or not it is necessary to change the
state of each of the first converter 33 and the second converter 34 from
the upper arm ON state to the boosting state, on the basis of the
required value of the system voltage VH that has been calculated at the
step S101 (a step S104). Specifically, if the required value of the
system voltage VH is equal to the source voltage VL, the first control
apparatus 37 determines that it is not necessary to change the state of
each of the first converter 33 and the second converter 34 from the upper
arm ON state to the boosting state. On the other hand, if the required
value of the system voltage VH is higher than the source voltage VL, the
first control apparatus 37 determines that it is necessary to change the
state of each of the first converter 33 and the second converter 34 from
the upper arm ON state to the boosting state.
[0056] As a result of the determination at the step S104, if it is
determined that it is not necessary to change the state of each of the
first converter 33 and the second converter 34 from the upper arm ON
state to the boosting state (the step S104: No), the first control
apparatus 37 generates the command signal C1* for keeping the first
converter 33 to be in the upper arm ON state and the command signal C2*
for keeping the second converter 34 to be in the upper arm ON state (a
step S106).
[0057] Then, the first control apparatus 37 controls the first converter
33 on the basis of the command signal C1* generated at the step S106 (the
step S107). Moreover, the second control apparatus 38 controls the second
converter 34 on the basis of the command signal C2* received from the
first control apparatus 37 (the step S201). As a result, both of the
first converter 33 and the second converter 34 keep being in the upper
arm ON state so that the system voltage VH agree with the target voltage
VH* (in this case, the target voltage VH* (i.e. the required value of the
system voltage VH) is equal to the source voltage VL).
[0058] On the other hand, as a result of the determination at the step
S104, if it is determined that it is necessary to change the state of
each of the first converter 33 and the second converter 34 from the upper
arm ON state to the boosting state (the step S104: Yes), the first
control apparatus 37 and the second control apparatus 38 perform a
below-described operation illustrated in FIG. 4 to change the state of
each of the first converter 33 and the second converter 34 from the upper
arm ON state to the boosting state.
[0059] (2-2) Flow of Operation for Changing State of Each of First
Converter 33 and Second Converter 34 from Boosting State to Upper Arm ON
State
[0060] Next, with reference to a flowchart illustrated in FIG. 3, an
operation for changing the state of each of the first converter 33 and
the second converter 34 from the boosting state to the upper arm ON state
will be described.
[0061] In the present embodiment, the first control apparatus 37 performs
the operation illustrated in FIG. 3 instead of generating the command
signal C1* and C2* for simultaneously changing the state of each of the
first converter 33 and the second converter 34 to the upper arm ON state.
The reason is as follows. Since the command signal C2* is transmitted
from the first control apparatus 37 to the second control apparatus 38, a
timing at which the second control apparatus 38 starts to control the
second converter 33 on the basis of the command signal C2* generated by
the first control apparatus 37 at a predetermined time is delayed with
respect to a timing at which the first control apparatus 37 starts to
control the first converter 34 on the basis of the command signal C1*
generated by the first control apparatus 37 at the same predetermined
time. This is because a delay time .DELTA.T occurs when the second
control apparatus 38 controls the second converter 34 on the basis of the
command signal C2*, wherein the delay time .DELTA.T includes a time that
is required for the first control apparatus 37 to transmit, to the second
control apparatus 38, the command signal C2* generated by the first
control apparatus 37 and a time that is required for the second control
apparatus 38 to receive the transmitted command signal C2* and then to
actually start to control the second converter 34 on the basis of the
received command signal C2*. Thus, if the command signals C1* and C2* for
simultaneously changing the state of each of the first converter 33 and
the second converter 34 to the upper arm ON state are generated without
considering the delay time .DELTA.T, a timing at which the state of the
second converter 34 is changed to the upper arm ON state is delayed by
the delay time .DELTA.T with respect to a timing at which the state of
the first converter 33 is changed to the upper arm ON state. In this
case, there is a possibility that undesired large electrical current
flows from the second converter 34 in the boosting state to the first
converter 33 in the upper arm ON state. Thus, in the present embodiment,
the operation illustrated in FIG. 3 is performed in order to prevent the
undesired large electrical current from flowing.
[0062] Specifically, as illustrated in FIG. 3, the first control apparatus
37 generates the command signal C1* for keeping the first converter 33 to
be in the boosting state (a step S111). Moreover, the first control
apparatus 37 generates the command signal C2* for changing the state of
the second converter 34 from the boosting state to an upper/lower arm OFF
state and then keeping the second converter 34 to be in the upper/lower
arm OFF state (the step S111). The upper/lower arm OFF state is a state
in which both of the upper arm element 341 and the lower arm element 342
keep being in the OFF state (namely, the second converter 34 is shut
down). Note that the upper/lower arm OFF state is one example of the
"third state".
[0063] Then, the first control apparatus 37 controls the first converter
33 on the basis of the command signal C1* generated at the step S111 (a
step S112). As a result, the first converter 33 keeps being in the
boosting state. Moreover, the second control apparatus 38 controls the
second converter 34 on the basis of the command signal C2* received from
the first control apparatus 37 (a step S211). As a result, the state of
the second converter 34 is changed from the boosting state to the
upper/lower arm OFF state and then the second converter 34 keeps being in
the upper/lower arm OFF state.
[0064] During a period when the first converter 33 and the second
converter 34 are controlled on the basis of the command signals C1* and
C2*, respectively, generated at the step S111, the first control
apparatus 37 determines whether or not a predetermined time T1 that is
one example of the "first predetermined time" has elapsed after starting
the control based on the command signals C1* and C2* generated at the
step S111 (a step S113). Namely, the first control apparatus 37
determines whether or not the predetermined time T1 has elapsed after
generating the command signal C2* for starting to change the state of the
second converter 34 to the upper/lower arm OFF state (the step S113).
Note that the predetermined time T1 is set to be any value that is equal
to or larger than the delay time .DELTA.T.
[0065] As a result of the determination at the step S113, if it is
determined that the predetermined time T1 has not yet elapsed (the step
S113: No), the second converter 34 is supposed not to be in the
upper/lower arm OFF state yet (namely, is supposed to be still in the
boosting state). This is because there is a possibility that the command
signal C2* for starting the change of the state of the second converter
34 to the upper/lower arm OFF state is not yet used (for example, not yet
received) by the second control apparatus 38 for controlling the second
converter 34 due to the delay time .DELTA.T. In this case, the first
control apparatus 37 keeps determining whether or not the predetermined
time T1 has elapsed while controlling the first converter 33 and the
second converter 34 on the basis of the command signals C1* and C2*,
respectively, generated at the step S111.
[0066] On the other hand, as a result of the determination at the step
S113, if it is determined that the predetermined time T1 has elapsed (the
step S113: Yes), the state of the second converter 34 is supposed to have
been already changed to the upper/lower arm OFF state. In this case, the
first control apparatus 37 generates the command signal C1* for changing
the state of the first converter 33 from the boosting state to the upper
arm ON state and then keeping the first converter 33 to be in the upper
arm ON state (a step S121). Moreover, the first control apparatus 37
generates the command signal C2* for keeping the second converter 34 to
be in the upper/lower arm OFF state (the step S121).
[0067] Then, the first control apparatus 37 controls the first converter
33 on the basis of the command signal C1* generated at the step S121 (a
step S122). As a result, the state of the first converter 33 is changed
from the boosting state to the upper arm ON state and then the first
converter 33 keeps being in the upper arm ON state. Moreover, the second
control apparatus 38 controls the second converter 34 on the basis of the
command signal C2* received from the first control apparatus 37 (a step
S221). As a result, the second converter 34 keeps being in the
upper/lower arm OFF state.
[0068] After the state of the first converter 33 has been changed to the
upper arm ON state, the first control apparatus 37 generates the command
signal C1* for keeping the first converter 33 to be in the upper arm ON
state (a step S131). Moreover, the first control apparatus 37 generates
the command signal C2* for changing the state of the second converter 34
from the upper/lower arm OFF state to the upper arm ON state and then
keeping the second converter 34 to be in the upper arm ON state (the step
S131).
[0069] Then, the first control apparatus 37 controls the first converter
33 on the basis of the command signal C1* generated at the step S131 (a
step S132). As a result, the first converter 33 keeps being in the upper
arm ON state. Moreover, the second control apparatus 38 controls the
second converter 34 on the basis of the command signal C2* received from
the first control apparatus 37 (a step S231). As a result, the state of
the second converter 34 is changed from the upper/lower arm OFF state to
the upper arm ON state and then the second converter 34 keeps being in
the upper arm ON state.
[0070] (2-3) Flow of Operation for Changing State of Each of First
Converter 33 and Second Converter 34 from Upper Arm ON State to Boosting
State
[0071] Next, with reference to a flowchart illustrated in FIG. 4, an
operation for changing the state of each of the first converter 33 and
the second converter 34 from the upper arm ON state to the boosting state
will be described.
[0072] In the present embodiment, the first control apparatus 37 performs
the operation illustrated in FIG. 4 instead of generating the command
signal C1* and C2* for simultaneously changing the state of each of the
first converter 33 and the second converter 34 to the boosting state. The
purpose is to prevent the undesired large electrical current from flowing
from the first converter 33 in the boosting state to the second converter
34 in the upper arm ON state, wherein the undesired large electrical
current is caused by a timing at which the state of the second converter
34 is changed to the boosting state being delayed by the delay time AT
with respect to a timing at which the state of the first converter 33 is
changed to the boosting state, as described above.
[0073] Specifically, as illustrated in FIG. 4, the first control apparatus
37 generates the command signal C1* for keeping the first converter 33 to
be in the upper arm ON state (a step S141). Moreover, the first control
apparatus 37 generates the command signal C2* for changing the state of
the second converter 34 from the upper arm ON state to the upper/lower
arm OFF state and then keeping the second converter 34 to be in the
upper/lower arm OFF state (the step S141). Then, the first control
apparatus 37 controls the first converter 33 on the basis of the command
signal C1* generated at the step S141 (a step S142). As a result, the
first converter 33 keeps being in the upper arm ON state. Moreover, the
second control apparatus 38 controls the second converter 34 on the basis
of the command signal C2* received from the first control apparatus 37 (a
step S241). As a result, the state of the second converter 34 is changed
from the upper arm ON state to the upper/lower arm OFF state and then the
second converter 34 keeps being in the upper/lower arm OFF state.
[0074] During a period when the first converter 33 and the second
converter 34 are controlled on the basis of the command signals C1* and
C2*, respectively, generated at the step S141, the first control
apparatus 37 determines whether or not the predetermined time T1 has
elapsed after starting the control based on the command signals C1* and
C2* generated at the step S141 (a step S143). Namely, the first control
apparatus 37 determines whether or not the predetermined time T1 has
elapsed after generating the command signal C2* for starting to change
the state of the second converter 34 to the upper/lower arm OFF state
(the step S143).
[0075] As a result of the determination at the step S143, if it is
determined that the predetermined time T1 has not yet elapsed (the step
S143: No), the second converter 34 is supposed not to be in the
upper/lower arm OFF state yet (namely, is supposed to be still in the
upper arm ON state). In this case, the first control apparatus 37 keeps
determining whether or not the predetermined time T1 has elapsed while
controlling the first converter 33 and the second converter 34 on the
basis of the command signals C1* and C2*, respectively, generated at the
step S141.
[0076] On the other hand, as a result of the determination at the step
S143, if it is determined that the predetermined time T1 has elapsed (the
step S143: Yes), the state of the second converter 34 is supposed to have
been already changed to the upper/lower arm OFF state. In this case, the
first control apparatus 37 generates the command signal C1* for changing
the state of the first converter 33 from the upper arm ON state to the
boosting state and then keeping the first converter 33 to be in the
boosting state (a step S151). Moreover, the first control apparatus 37
generates the command signal C2* for keeping the second converter 34 to
be in the upper/lower arm OFF state (the step S151). Then, the first
control apparatus 37 controls the first converter 33 on the basis of the
command signal C1* generated at the step S151 (a step S152). As a result,
the state of the first converter 33 is changed from the upper arm ON
state to the boosting state and then the first converter 33 keeps being
in the boosting state. Moreover, the second control apparatus 38 controls
the second converter 34 on the basis of the command signal C2* received
from the first control apparatus 37 (a step S251). As a result, the
second converter 34 keeps being in the upper/lower arm OFF state.
[0077] After the state of the first converter 33 has been changed to the
boosting state, the first control apparatus 37 generates the command
signal C1* for keeping the first converter 33 to be in the boosting state
(a step S161). Moreover, the first control apparatus 37 generates the
command signal C2* for changing the state of the second converter 34 from
the upper/lower arm OFF state to the boosting state and then keeping the
second converter 34 to be in the boosting state (the step S161). Then,
the first control apparatus 37 controls the first converter 33 on the
basis of the command signal C1* generated at the step S161 (a step S162).
As a result, the first converter 33 keeps being in the boosting state.
Moreover, the second control apparatus 38 controls the second converter
34 on the basis of the command signal C2* received from the first control
apparatus 37 (a step S261). As a result, the state of the second
converter 34 is changed from the upper/lower arm OFF state to the
boosting state and then the second converter 34 keeps being in the
boosting state.
[0078] (3) Description of Technical Effect
[0079] Next, a technical effect of the electrical power system 30 in the
present embodiment will be described. In the following description,
firstly, with reference to FIG. 5 and FIG. 6, a technical problem
occurred in an electrical power system in a comparison example will be
described. The electrical power system in the comparison example is
configured to generate the command signals C1* and C2* for simultaneously
changing the state of each of the first converter 33 and the second
converter 34 to the upper arm ON state or the boosting state. Then, with
reference to FIG. 7 and FIG. 8, technical effect of the electrical power
system 30 in the present embodiment will be described. Note that FIG. 5
to FIG. 8 illustrate an example in which each of the first converter 33
and the second converter 34 boosts the electrical voltage outputted from
the electrical power source 31, for the purpose of simple illustration.
[0080] (3-1) Technical Problem Occurred in Electrical Power System in
Comparison Example
[0081] FIG. 5 is a timing chart that illustrates temporal transition of
the state of the electrical power system in the comparison example, when
the electrical power system in the comparison example changes the state
of each of the first converter 33 and the second converter 34 from the
boosting state to the upper arm ON state. The state of the electrical
power system includes the required value of the system voltage VH, the
command signals C1* and C2*, the state of each of the first converter 33
and the second converter 34, the target voltage VH*, the system voltage
VH, a converter current IL1 flowing through the first converter 33 and a
converter current IL2 flowing
[0082] As illustrated by a first graph in FIG. 5, the required value of
the system voltage VH, which is higher than the source voltage VL before
a time t51, decreases to be equal to the source voltage VL at the time
t51. In this case, as illustrated by a second graph and a third graph in
FIG. 5, the command signal C1* for changing the state of the first
converter 33 from the boosting state to the upper arm ON state and the
command signal C2* for changing the state of the second converter 34 from
the boosting state to the upper arm ON state are generated at the time
t51. As a result, as illustrated by a fifth graph in FIG. 5, the state of
the first converter 33 is changed from the boosting state to the upper
arm ON state at the time t51. On the other hand, since the above
described delay time .DELTA.T occurs, as illustrated by a fourth graph in
FIG. 5, the command signal C2* generated at the time t51 is received by
the second control apparatus 38 at a time t52 that is delayed by the
delay time .DELTA.T with respect to the time t51. As a result, as
illustrated by a sixth graph in FIG. 5, the state of the second converter
34 is changed from the boosting state to the upper arm ON state at the
time t52. Therefore, in a first time period from the time t51 to the time
t52, the second converter 34 is in the boosting state although the first
converter 33 is in the upper arm ON state. Thus, as illustrated by a
seventh graph in FIG. 5, in the first time period, although the target
voltage VH* is set to be the source voltage VL, the second converter 34
keeps boosting the electrical voltage outputted from the electrical power
source 31 on the basis of the previous target voltage VH* (namely, the
previous target voltage VH* higher than the source voltage VL). On the
other hand, as illustrated by an eighth graph in FIG. 5, the system
voltage VH decreases to be equal to the source voltage VL in the first
time period, because the first converter 33 is in the upper arm ON state
in the first time period. Thus, as illustrated by a tenth graph in FIG.
5, the second converter 34 tries to boost the electrical voltage
outputted to the motor generator 10 by allowing the relatively large
converter current IL2 to flow in the first time period. However, as
illustrated by a ninth graph in FIG. 5, at least one portion of the
converter current IL2 returns to the first converter 33 that does not
boost the electrical voltage outputted from the electrical power source
31 and thus does not allow the relatively large converter current IL1 to
flow. As a result, the relatively large electrical current (specifically,
the electrical current that is large enough to deteriorate resistance of
the first converter 33 and the second converter 34 with respect to heat)
flows through both of the first converter 33 and the second converter 34.
[0083] Next, FIG. 6 is a timing chart that illustrates temporal transition
of the state of the electrical power system in the comparison example,
when the electrical power system in the comparison example changes the
state of each of the first converter 33 and the second converter 34 from
the upper arm ON state to the boosting state. As illustrated by a first
graph in FIG. 6, the required value of the system voltage VH, which is
equal to the source voltage VL before a time t61, increases to be higher
than the source voltage VL at the time t61. In this case, as illustrated
by a second graph and a third graph in FIG. 6, the command signal C1* for
changing the state of the first converter 33 from the upper arm ON state
to the boosting state and the command signal C2* for changing the state
of the second converter 34 from the upper arm ON state to the boosting
state are generated at the time t61. As a result, as illustrated by a
fifth graph in FIG. 6, the state of the first converter 33 is changed
from the upper arm ON state to the boosting state at the time t61. On the
other hand, since the above described delay time .DELTA.T occurs, as
illustrated by a sixth graph in FIG. 6, the state of the second converter
34 is changed from the upper arm ON state to the boosting state at a time
t62 that is delayed by the delay time .DELTA.T with respect to the time
t61. Therefore, in a second time period from the time t61 to the time
t62, the second converter 34 is in the upper arm ON state although the
first converter 33 is in the boosting state. Thus, in the second time
period, although the target voltage VH* is set to be the required value
of the system voltage VII higher than the source voltage VL as
illustrated by a seventh graph in FIG. 6, the system voltage VH does not
increases and keeps being equal to the source voltage VL as illustrated
by a eighth graph in FIG. 6, because the second converter 34 is in the
upper arm ON state. Thus, as illustrated by a ninth graph in FIG. 6, the
first converter 33 tries to boost the electrical voltage outputted to the
motor generator 10 by allowing the relatively large converter current IL1
to flow in the second time period. However, as illustrated by a tenth
graph in FIG. 6, at least one portion of the converter current IL1
returns to the second converter 34 that does not boost the electrical
voltage outputted from the electrical power source 31 and thus does not
allow the relatively large converter current IL2 to flow. As a result,
the relatively large electrical current flows through both of the first
converter 33 and the second converter 34.
[0084] (3-2) Technical Effect of Electrical Power System 30 in Present
Embodiment
[0085] Next, FIG. 7 is a timing chart that illustrates temporal transition
of the state of the electrical power system 30 in the present embodiment,
when the electrical power system 30 in the present embodiment changes the
state of each of the first converter 33 and the second converter 34 from
the boosting state to the upper arm ON state. As illustrated by a first
graph in FIG. 7, the required value of the system voltage VH, which is
higher than the source voltage VL before a time t71, decreases to be
equal to the source voltage VL at the time t71. In this case, as
illustrated by a second graph and a third graph in FIG. 7, the command
signal C1* for keeping the state of the first converter 33 to be in the
boosting state and the command signal C2* for changing the state of the
second converter 34 from the boosting state to the upper/lower arm OFF
state are generated at the time t71. As a result, as illustrated by a
fifth graph in FIG. 7, the first converter 33 keeps being in the boosting
state after the time t71. Moreover, as illustrated in a sixth graph in
FIG. 7, the state of the second converter 34 is changed from the boosting
state to the upper/lower arm OFF state at a time t72 that is delayed by
the delay time .DELTA.T with respect to the time t71. As a result, as
illustrated by a tenth graph in FIG. 7, the converter current IL2 is zero
after the time t72. Then, it is determined at a time t73 that the
predetermined time T1 has elapsed after the time t71 at which the command
signal C2* for changing the state of the second converter 34 to the
upper/lower arm OFF state is generated. Therefore, as illustrated by the
second graph in FIG. 7, the command signal C1* for changing the state of
the first converter 33 from the boosting state to the upper arm ON state
is generated at the time t73. Moreover, as illustrated by a seventh graph
in FIG. 7, the target voltage VH*, which is set to be a value higher than
the source voltage VL before the time t73, decreases to be equal to the
source voltage VL at the time t73. As a result, as illustrated by the
fifth graph in FIG. 7, the state of the first converter 33 is changed
from the boosting state to the upper arm ON state at the time t73. As a
result, as illustrated by an eighth graph in FIG. 7, the system voltage
VH, which is higher than the source voltage VL before the time t73,
decreases to be equal to the source voltage VL after the time t73. Then,
the command signal C2* for changing the state of the second converter 34
from the upper/lower arm OFF state to the upper arm ON state is generated
at a time t74 after the time t73. As a result, as illustrated by the
sixth graph in FIG. 7, the state of the second converter 34 is changed
from the upper/lower arm OFF state to the upper arm ON state at a time
t75 that is delayed by the delay time .DELTA.T with respect to the time
t74. Thus, the above described first time period in which the second
converter 34 is in the boosting state although the first converter 33 is
in the upper arm ON state does not exist in the electrical power system
30 in the present embodiment.
[0086] Next, FIG. 8 is a timing chart that illustrates temporal transition
of the state of the electrical power system 30 in the present embodiment,
when the electrical power system 30 in the present embodiment changes the
state of each of the first converter 33 and the second converter 34 from
the upper arm ON state to the boosting state. As illustrated by a first
graph in FIG. 8, the required value of the system voltage VH, which is
equal to the source voltage VL before a time t81, increases to be higher
than the source voltage VL at the time t81. In this case, as illustrated
by a second graph and a third graph in FIG. 8, the command signal C1* for
keeping the state of the first converter 33 to be in the upper arm ON
state and the command signal C2* for changing the state of the second
converter 34 from the upper arm ON state to the upper/lower arm OFF state
are generated at the time t81. As a result, as illustrated by a fifth
graph in FIG. 7, the first converter 33 keeps being in the upper arm ON
state after the time t81. Moreover, as illustrated in a sixth graph in
FIG. 8, the state of the second converter 34 is changed from the upper
arm ON state to the upper/lower arm OFF state at a time t82 that is
delayed by the delay time .DELTA.T with respect to the time t81. As a
result, as illustrated by a tenth graph in FIG. 8, the converter current
IL2 is zero after the time t82. Then, it is determined at a time t83 that
the predetermined time T1 has elapsed after the time t81 at which the
command signal C2* for changing the state of the second converter 34 to
the upper/lower arm OFF state is generated. Therefore, as illustrated by
the second graph in FIG. 8, the command signal C1* for changing the state
of the first converter 33 from the upper arm ON state to the boosting
state is generated at the time t83. Moreover, as illustrated by a seventh
graph in FIG. 8, the target voltage VH*, which is equal to the source
voltage VL before the time t83, increases to be equal to the required
value of the system voltage VH at the time t83. As a result, as
illustrated by the fifth graph in FIG. 8, the state of the first
converter 33 is changed from the upper arm ON state to the boosting state
at the time t83. As a result, as illustrated by an eighth graph in FIG.
8, the system voltage VH, which is equal to the source voltage VL before
the time t83, increases to be equal to the required value of the system
voltage VH after the time t83. Then, the command signal C2* for changing
the state of the second converter 34 from the upper/lower arm OFF state
to the boosting state is generated at a time t84 after the time t83. As a
result, as illustrated by the sixth graph in FIG. 8, the state of the
second converter 34 is changed from the upper/lower arm OFF state to the
boosting state at a time t85 that is delayed by the delay time .DELTA.T
with respect to the time t84. Thus, the above described second time
period in which the second converter 34 is in the upper arm ON state
although the first converter 33 is in the boosting state does not exist
in the electrical power system 30 in the present embodiment.
[0087] As described above, one of the first converter 33 and the second
converter 34 is not in the upper arm ON state when the other one of the
first converter 33 and the second converter 34 is in the boosting state
in the electrical power system in the present embodiment. Thus,
relatively large electrical currents IL1 and IL2 do not flow through the
first converter 33 and the second converter 34, respectively, when the
state of each of the first converter 33 and the second converter 34 is
changed from the boosting state to the upper arm ON state or from the
upper arm ON state to the boosting state. Therefore, it is possible to
appropriately suppress the deterioration of the resistance of the first
converter 33 and the second converter 34 with respect to the heat
[0088] (4) Modified Example
[0089] In the above described example, as illustrated in FIG. 7 and FIG.
8, the first control apparatus 37 generates the command signal C2* for
changing the state of the second converter 34 from the upper/lower arm
OFF state to the upper arm ON state or the boosting state after
generating the command signal C1* for changing the state of the first
converter 33 from the boosting state to the upper arm ON state or from
the upper arm ON state to the boosting state. However, as illustrated in
FIG. 9, the first control apparatus 37 may generate the command signal
C2* for changing the state of the second converter 34 from the
upper/lower arm OFF state to the upper arm ON state or the boosting state
before generating the command signal C1* for changing the state of the
first converter 33 from the boosting state to the upper arm ON state or
from the upper arm ON state to the boosting state. FIG. 9 illustrates an
example in which the first control apparatus 37 generates the command
signal C2* for changing the state of the second converter 34 from the
upper/lower arm OFF state to the upper arm ON state or the boosting state
a time t93 before a time t94. Even in this case, as long as the state of
the second converter 34 is changed from the upper/lower arm OFF state to
the upper arm ON state or the boosting state after the state of the first
converter 33 is changed from the boosting state to the upper arm ON state
or from the upper arm ON state to the boosting state, the above described
technical effect can be achieved.
[0090] Specifically, the first control apparatus 37 may generate the
command signal C2* for changing the state of the second converter 34 from
the upper/lower arm OFF state to the upper arm ON state or the boosting
state after a predetermined time T2 has elapsed from a time point at
which the command signal C2* for starting to change the state of the
second converter 34 to the upper/lower arm OFF state is generated. Note
that the predetermined time T2 is one example of the "second
predetermined time". FIG. 9 illustrates an example in which the first
control apparatus 37 generates the command signal C2* for changing the
state of the second converter 34 from the upper/lower arm OFF state to
the upper arm ON state or the boosting state at the time t93 at which the
predetermined time T2 has elapsed from a time t91. In this case, the
predetermined time T2 is set to be any time longer than a difference
between the predetermined time T1 and the delay time .DELTA.T (namely,
predetermined time T1-delay time .DELTA.T). When the predetermined time
T2 is set in this manner, the state of the second converter 34 is changed
from the upper/lower arm OFF state to the upper arm ON state or the
boosting state after the state of the first converter 33 is changed from
the boosting state to the upper arm ON state or from the upper arm ON
state to the boosting state. FIG. 9 illustrates an example in which the
state of the second converter 34 is changed from the upper/lower arm OFF
state to the upper arm ON state or the boosting state at a time t95 that
is delayed by the delay time .DELTA.T with respect to the time t93. In
this case, the time t95 is after a time t94 at which the state of the
first converter 33 is changed from the upper arm ON state to the boosting
state. This is because a time period
(=T2+.DELTA.T>T1-.DELTA.T+.DELTA.T=T1) from the time t91 to the time
t95 is longer than a time period (=T1) from the t91 to the time t94.
[0091] At least one portion of the structure of the vehicle 1 (for
example, at least one portion of the structure of at least one of the
first control apparatus 37 and the second control apparatus 38) in the
present embodiment can be eliminated or modified accordingly. At least
one portion of the operation that is performed by at least one of the
first control apparatus 37 and the second control apparatus 38 in the
present embodiment can be eliminated or modified accordingly. The order
of the processes in the operation that is performed by at least one of
the first control apparatus 37 and the second control apparatus 38 can be
changed accordingly.
[0092] This application is based upon and claims the benefit of priority
of the prior Japanese Patent Application No. 2016-241127, filed on Dec.
13, 2016, the entire contents of which are incorporated herein by
reference. In addition, the entire contents of the above described Patent
Literatures 1 and 2 is incorporated herein by reference.
[0093] All examples and conditional language recited herein are intended
for pedagogical purposes to aid the reader in understanding the invention
and the concepts contributed by the inventor to furthering the art, and
are to be construed as being without limitation to such specifically
recited examples and conditions, nor does the organization of such
examples in the specification relate to a showing of the superiority and
inferiority of the invention. Although the embodiments of the present
invention have been described in detail, it should be understood that the
various changes, substitutions, and alterations could be made hereto
without departing from the spirit and scope of the invention. An
electrical power system, which involve such changes, are also intended to
be within the technical scope of the present invention.
REFERENCE SIGNS LIST
[0094] 1 vehicle [0095] 10 motor generator [0096] 30 electrical power
system [0097] 31 electrical power source [0098] 33 first converter [0099]
331 upper arm element [0100] 332 lower arm element [0101] 333 reactor
[0102] 334, 335 diode [0103] 34 second converter [0104] 341 upper arm
element [0105] 342 lower arm element [0106] 343 reactor [0107] 344, 345
diode [0108] 35 smoothing condenser [0109] 36 inverter [0110] 37 first
control apparatus [0111] 38 second control apparatus [0112] 39
communication line [0113] N1, N2 node [0114] PL power source line [0115]
GL ground line [0116] C1*, C2* command signal [0117] VH system voltage
[0118] VL source voltage [0119] VH* target voltage [0120] .DELTA.T delay
time [0121] T1, T2 predetermined time [0122] IL1, IL2 converter current
* * * * *